Most people hiring construction contractors in Kenya ask about price first and approvals last. That order causes trouble. A project that starts without the right drawings and sign-offs can be stopped halfway, and the money already spent doesn’t come back.
At R World Enterprise Ltd we’ve been building in Nairobi since 2002, and approvals are part of how we run a project, not a separate errand for the client. This guide explains which approvals usually come up, who prepares what, and the questions to ask any contractor before work starts.
The approvals we guide clients through
The approvals we guide clients through fall into three groups:
| Approval | What it involves | Who does the work |
|---|---|---|
| Architectural and structural drawings | Plans that show what will be built and how it will stand | Prepared during the design stage, with engineers and surveyors |
| Environmental approvals | Needed for some projects, depending on size, use and location | Assessed at planning; arranged where applicable |
| County sign-off | Approval from the county before and during construction | Coordinated as part of project management |
Requirements change and differ by county and project type. Always confirm the current list with your county and your contractor at the start, in writing.
Where approvals fit in the project
Our process runs in three stages, and approvals sit in the middle one:
- Planning. A free consultation and site assessment to agree goals, budget and timeline.
- Design. Detailed drawings and specifications, coordinated with engineers, surveyors and the relevant authorities for compliance and approvals.
- Build. Construction managed from materials sourcing to handover, with timelines and standards tracked.
That middle stage is where many projects lose weeks. If drawings go back and forth with the county because the engineer and the designer weren’t talking, the start date slips. Keeping design and construction under one team, which is what our Design & Build service does, cuts down those gaps.
Separate teams or one team: what changes for approvals
| Consideration | Design and construction split | Design and construction under one team |
|---|---|---|
| Engineer and designer | They may not be talking, so drawings go back and forth with the county | One team handles both, which cuts down the gaps |
| Start date | Slips when drawings keep going back and forth | Less likely to slip, because there are fewer gaps to cause it |
| Question to ask | Will your engineers and surveyors coordinate with the county, or is that on me? | Our Design & Build service keeps design and construction under one team |
Five questions to ask any contractor about approvals
- “Which approvals will my project need, and who prepares each one?”
- “Will your engineers and surveyors coordinate with the county, or is that on me?”
- “What is your NCA registration category?” Ours is NCA Category 2.
- “How will approvals affect the timeline you’re quoting?”
- “What happens if the county asks for changes?”
A good contractor answers these without hesitating. If the answer to question 1 is “don’t worry about it,” worry about it.
For more on choosing a firm, see our post on what to check before you sign and the difference between registered firms and informal fundis.
Why credentials matter here
Approvals are about trust. The county and your financiers want to know the people building your project are accountable. That’s why we keep our credentials current:
| Credential | Detail |
|---|---|
| NCA registration | Category 2 (local contractors) |
| Quality management | ISO 9001:2015, achieved in 2016 |
| Recognition | Top 100 Award 2018 and 2019; Industry Leadership Award 2022 |
| Experience | Founded 2002, incorporated as a limited company in 2008 |
You can read more about us on our About page.
Approvals on fit-outs and interiors
Not every job is a new building. Office fit-outs, bank branches and restaurant interiors can also involve structural adjustments, electrical work and landlord or building management sign-off. If you’re planning interior work in an existing building, read our fit-out services page and ask us early which sign-offs your space will need.
Frequently asked questions
Do construction contractors in Kenya handle building approvals?
It depends on the contractor. At R World, we guide clients through architectural and structural drawings, environmental approvals where applicable, and county sign-off as part of project management.
What is R World’s NCA category?
NCA Category 2.
How long do approvals take?
It varies by project and county. We give you a timeline during the planning stage that includes approvals.
Can I start building while approvals are pending?
We don’t advise it. Confirm the position with your county and contractor before any work starts.
Do you work outside Nairobi?
We serve Nairobi and surrounding counties. Contact us to confirm your location.
Get approvals right from day one
Good construction contractors in Kenya treat approvals as part of the job. Ask who prepares each drawing, who talks to the county, and how approvals affect your timeline before you sign anything.